Drill Site Construction for Power Station
Carry out full site preparation for two CBM drill sites just south of Doncaster.
Project Title
Drill Site Construction for Power Station
Location
Bawtry, Yorkshire
Country
United Kingdom
Client
Greenpark Energy Ltd.
Business Sectors
Oil and Gas site preparation
Services (Technical Disciplines)
Meehan Drilling were contracted by Greenpark Energy Limited to carry out full site preparation for two CBM drill sites just south of Doncaster. With its experience with site preparation and utilities Meehan Drilling were able to offer a complete service from green field right up to the drilling stage.
Experienced operators we stripped the top soil from the site and laid down Geogrid and Geomembrane to ensure that the site fully complies with all planning requirements. A drilling cellar with concrete enclosure was also installed. 200mm of crushed stone was then installed, compacted and rolled. 365m of running road was also installed to ensure the weather did not impede access to the site. Meehan Drilling then installed conductor casing on both sites and drilled down to 550m to retrieve core samples of the underlying coal seams. Once all works are complete, the site will be reinstated to its original condition.
Project Objectives/Outcomes
Meehan Drilling provided an integrated full service solution from site preparation to decommissioning.
Our Role
Contractor, Project Manager