FEED: Upgrade of Treated Sewage Effluent (TSE) Network and Storage
In order to adequately serve current and future locations and developments in Mesaieed by the TSE Qatar Petroleum have initiated a TSE upgrade project.
Project Title
FEED: Upgrade of Treated Sewage Effluent (TSE) Network and Storage
Location
Mesaieed
Country
Qatar
Client
Qatar Petroleum
Business Sectors
Infrastructure/Water Resources
Services (Technical Disciplines)
Baseline surveys of existing network; build hydraulic madel for the proposed network (using STONER/SynerGEE); Surge Analysis; detailed engineering; provide MIC staff training.
Project Objectives
Design and contact documentation for the expansion of TSE from 4,000m3/day to 18,000m3/day.
Our Role
Front End Engineering Design (FEED) with ASCO.
Geoscience Ireland Contact
Michael Looby – mlooby@blpge.com