Roads in Hhohho District (24km), Swaziland
Design and Supervision of Upgrading of Secondary Roads in Hhohho District (24km), Swaziland.
Project Title
Design and Supervision of Upgrading of Secondary Roads in Hhohho District (24km)
Location
Hhohho District
Country
Swaziland
Client
Delegation of the EU to Swaziland
Business Sectors
Infrastructure
Services (Technical Disciplines)
- Feasibility
- Preliminary Design
- Detailed design
- Tender Dossiers
- Procurement
- Construction Supervision
- Construction Management
Project Objectives/Outcomes
The project provided for the design and supervision of secondary roads in Hhoho districk, Swaziland.
Divided into two Lots, project objectives outlined are;
- Lot No. 1 – Upgrading of the section of road from Mananga bridge to Sihhoye (14km) to paved bitumen standard. The new carriageway consists of two 3.6m wide land with a 1m wide shoulder on each side.
- Lot No. 1 includes : Planning, site surveys , investigation, detailed design and tender documents.
- Lot No. 2 – Upgrading of the section of road Dvokolakwo – Manzana (6km) including a major overtopable culvert / bridge and a section of concrete road.
Our Role
Nicholas O’Dwyer Ltd was responsible for the preliminary design and site investigation, detailed design, tender documents under EU/EDF procedures and works tender launch and clarifications inclusive of evaluation bids.
Assigned “Supervisor’s Representative” of Lot Nos. 1 and 2 – construction supervision and contract administration
Geoscience Ireland Contact
Richard Crowe – rcrowe@nodwyer.com