Water Resources

Water, Sanitation, and Drainage (WSD) Project

August 1, 2024/in Water Resources

Project:

Water, Sanitation, and Drainage (WSD) Project

Location:

Dili, Timor Leste

Client:

Millennium Challenge Account (Timor Leste)
€293,780,000 (EST.)

Business Sectors:

  • Wastewater Treatment Plant
  • Wastewater Network

Services (Technical Disciplines):

  • Preliminary Design
  • Detailed Design
  • Tender Dossiers
  • Procurement
  • Capacity Building

Project Objectives/Outcomes:

In Timor-Leste, the presence of poor water quality and widespread faecal bacterial contamination in water sources and the environment poses a significant threat to the health of both children and adults. This contamination often leads to frequent and prolonged episodes of diarrheal diseases, and in some cases, even fatalities. Currently, the wastewater generated in Dili is disposed of directly into the surface aquifer or is channelled into the ocean through the city’s drainage canals without proper disinfection. These practices have resulted in the contamination of both private and public drinking water wells with faecal matter. The primary goal of the WSD Project is to mitigate faecal contamination in the environment and enhance the quality of drinking water, thereby reducing the burden of diarrheal diseases in Dili. The project involves building a brand-new sewerage system from scratch that will benefit around 300,000 people. By doing this, we aim to reduce this contamination and improve the quality of drinking water in Dili, ultimately preventing people from getting sick.

Our Role:

  • Prepare Basic Designs
  • Develop EIS/EMPs as required for the Timorese Environmental Licensing for the WSD Project
  • Prepare Employer’s requirements for the Design-Build Yellow Book contract and the Works Requirements (detailed design drawings, technical specifications and bill of quantities) for the Design-Bid-Build Red Book Contract based upon the approved Basic
  • Designs and the approved EIS/EMPs
  • Develop tender documents for the contracts
  • Obtain local Environmental License for the construction of the Wastewater Networks utilizing the detailed designs of the wastewater networks
  • Develop resettlement action plans that identify Project Affected Persons (PAPs)
  • Prepare a Gender and Social Inclusion Plan
  • Prepare a final ESIA for MCC approval
  • Perform field surveys, soil investigations, review completed feasibility study work products and Dili Water Supply designs and documents
  • Review piped wastewater collection system recommendations included in Feasibility Study
  • Review Transmission/Conveyance design recommendations included in Feasibility Study
  • Review feasibility studies and the draft ESIA documents
  • Develop a construction and commissioning schedule
  • Prepare relevant sections of the tender documents for the design-build contract, suited for International Federation of Consulting Engineers (“FIDIC”) Design-Build Contract (Yellow Book)
  • Prepare confidential detailed cost estimates
  • Provide advisory services to the evaluation panels
  • Prepare detailed designs of the conventional sewers, simplified sewers, house connections, installation of new toilets and septic system abandonment for the Wastewater Networks within the WSD Project Area 106

Geoscience Ireland Contact: Michel Davitt – mdavitt@nodwyer.com

Share this entry
  • Share on Facebook
  • Share on X
  • Share on WhatsApp
  • Share on Pinterest
  • Share on LinkedIn
  • Share by Mail
https://i0.wp.com/www.geoscience.ie/wp-content/uploads/2024/08/project-timor-leste-water.jpg?fit=900%2C600&ssl=1 600 900 GSI-Admin https://www.geoscience.ie/wp-content/themes/master/images/geoscience-logo-v1.png GSI-Admin2024-08-01 09:16:062024-08-01 09:17:11Water, Sanitation, and Drainage (WSD) Project

Latest Projects

  • FLI Precast Turns Power Plant Byproduct into Low Carbon InnovationJune 9, 2025 - 11:22 am
  • Advanced Drilling Technology Demonstration by Priority in LaosMay 26, 2025 - 12:54 pm
  • Mincon DTH Waterhammer & Spiral Flush Casing SystemMay 26, 2025 - 11:23 am
  • Templemore Flood Relief SchemeNovember 7, 2024 - 9:33 am
  • Compass Informatics Lead in Using Earth Observation Data to Tackle Sustainability IssuesSeptember 17, 2024 - 12:02 pm
  • TELLUS Geochemical Sampling Completed by Aurum Exploration for Geological Survey IrelandAugust 20, 2024 - 8:52 am
  • International Audit of Iron Ore MinesAugust 7, 2024 - 11:36 am
  • Dar Es Salaam Water Supply Distribution Network (Part 1)August 1, 2024 - 9:36 am
  • Supervision of Design/Build of Sumbawanga – Matai – Kasanga Port Road (112km)August 1, 2024 - 9:32 am
  • Strategic Pipeline Alliance – Complex Trenchless CrossingsAugust 1, 2024 - 9:30 am
All Projects

Latest News

  • FLI Precast Turns Power Plant Byproduct into Low Carbon InnovationJune 9, 2025 - 11:22 am
  • Advanced Drilling Technology Demonstration by Priority in LaosMay 26, 2025 - 12:54 pm
  • Minerex Drilling Joins Geoscience Ireland (GI)May 23, 2025 - 9:40 am
  • Ronan O ‘Toole Joins Geoscience Ireland (GI) Panel of ExpertsMay 13, 2025 - 3:33 pm
  • Geoscience Ireland (GI) Director Sean Finlay elected President of the Irish Academy of EngineeringMay 2, 2025 - 7:51 am
All News

GSI Logo
DFA Logo EI Logo
  • Home
  • Expertise
  • Projects
  • About
  • News
  • Contact
© Copyright Geoscience Ireland
  • X
  • LinkedIn
  • Home
  • Privacy
Scroll to top

This site uses cookies. By continuing to browse the site, you are agreeing to our use of cookies.

OKLearn more

Cookie and Privacy Settings



How we use cookies

We may request cookies to be set on your device. We use cookies to let us know when you visit our websites, how you interact with us, to enrich your user experience, and to customize your relationship with our website.

Click on the different category headings to find out more. You can also change some of your preferences. Note that blocking some types of cookies may impact your experience on our websites and the services we are able to offer.

Essential Website Cookies

These cookies are strictly necessary to provide you with services available through our website and to use some of its features.

Because these cookies are strictly necessary to deliver the website, you cannot refuse them without impacting how our site functions. You can block or delete them by changing your browser settings and force blocking all cookies on this website.

Google Analytics Cookies

These cookies collect information that is used either in aggregate form to help us understand how our website is being used or how effective our marketing campaigns are, or to help us customize our website and application for you in order to enhance your experience.

If you do not want that we track your visist to our site you can disable tracking in your browser here:

Other external services

We also use different external services like Google Webfonts, Google Maps and external Video providers. Since these providers may collect personal data like your IP address we allow you to block them here. Please be aware that this might heavily reduce the functionality and appearance of our site. Changes will take effect once you reload the page.

Google Webfont Settings:

Google Map Settings:

Vimeo and Youtube video embeds:

Privacy Policy

You can read about our privacy policy in detail on our Privacy Policy Page.

Privacy
Accept settingsHide notification only
Open Message Bar